Our Projects

Springer Nature Project

Springer Nature

  • Project: Cat B fit out
  • Location: Kings Cross, London
  • Client: Springer Nature
  • Main Contractor: Overbury
  • Value: £480,000
  • Duration: 18 weeks

Project to streamline the campus footprint from five buildings down to three. Redesigned workspaces in Porters Gate and Porters Wharf to support agile working, optimising space for an efficient and flexible environment.

2 London Bridge Project

2 London Bridge

  • Project: Reception refurbishment
  • Location: 2 London Bridge
  • Main Contractor: Epiphany
  • Value: £45,000
  • Duration: 12 weeks

Installation of ceiling pendants, wall lights, and desk lamps to complement the new reception desk and furniture.

Cheniere Energy Project

Cheniere Energy

  • Project: Cat B fit out
  • Location: ZigZag Building, Victoria Street, London
  • Client: Cheniere Energy
  • Main Contractor: Overbury
  • Value: £560,000
  • Duration: 20 weeks

Cat B fit out of level 3 in the iconic ZigZag Building. Modern office with a mix of suspended, recessed, and feature lighting. Fire alarms and power systems adapted for new layouts and AV installations.

IFM Investors Project

IFM Investors

  • Project: Cat B fit out
  • Location: 2 London Wall, London
  • Client: IFM Investors
  • Main Contractor: Overbury
  • Value: £100,000
  • Duration: 9 weeks

Designed and delivered a desirable, environmentally conscious workspace. Lighting highlights greenery and features, with open plan areas, offices, meeting rooms, and lounge spaces.

BDB Pitmans Project

BDB Pitmans

  • Project: Cat B fit out
  • Location: St Paul’s, London
  • Client: BDB Pitmans LLP
  • Main Contractor: Overbury
  • Value: £520,000
  • Duration: 28 weeks

High-end fit out of two floors at 2 Bartholomew Close, including reception, open plan office, meeting rooms, and board room with new LED and energy efficient lighting controls.

Charlotte Tilbury Project

Charlotte Tilbury

  • Project: Cat B fit out
  • Location: Aldwych, London
  • Client: Charlotte Tilbury
  • Main Contractor: Overbury
  • Value: £370,000
  • Duration: 38 weeks

Fit out of three floors for Charlotte Tilbury head office. Open plan office with retractable desks for catwalks, plus breakout areas, meeting rooms, and phone booths on each floor.

One London Wall Project

One London Wall

  • Project: Cat A fit out
  • Location: Barbican, London
  • Client: One London Wall
  • Main Contractor: Collins Construction
  • Value: £610,000
  • Duration: 14 weeks

Cat A fit out of the 10th, 9th, and 4th floors. New modular wiring, lighting, and controls throughout open plan areas, with illuminated rondels using LED tape.

KCL Macadam Project

KCL Macadam

  • Project: Cat B refurbishment
  • Location: Temple, London
  • Client: King’s College London
  • Main Contractor: Overbury
  • Value: £1.5m
  • Duration: 55 weeks

Complete refurbishment of eight floors into high-end teaching areas, labs, theatres, and lecture hall. Upgraded communal areas, plant rooms, and installed energy efficient lighting and AV systems.

Dane House Project

Dane House

  • Project: Dane House
  • Location: Brighton
  • Client: Elysium Healthcare Ltd
  • Main Contractor: Apex Contractors Ltd
  • Value: £350,000
  • Duration: 34 weeks

Refurbishment to provide specialist care facilities. Full design and installation of new electrical services, including lighting, power, CCTV, fire and intruder alarms, data, and nurse call systems. Both public and secure residential areas upgraded.

Nokia Paddington Project

Nokia Paddington

  • Project: Cat B fit out of office space
  • Location: Paddington, London
  • Client: Nokia
  • Main Contractor: Overbury
  • Value: £110,000
  • Duration: 10 weeks

New reception area and client meeting rooms with feature lighting and booking system. Open plan offices and meeting rooms with access to kitchen and dining area.

London Bank Project

London Bank

  • Project: Cat B fit out of office space
  • Location: Bishopsgate, London
  • Client: London Bank
  • Main Contractor: Vinstrata Builders (London) Ltd
  • Value: £150,000
  • Duration: 16 weeks

Upgrade of distribution and new UPS system. Installation of new IT suite and infrastructure, underfloor bus-bar, upgraded lighting, and advanced lighting controls in all offices and meeting rooms.